Operations

Judge us the way
an operator would.

This page is written for the person who has to hand a site over on Monday: how mobilisation runs, how quality is held week after week, and what actually happens when something goes wrong at 5:40am.

Mobilisation

From handshake to first shift
in two weeks.

Week −2 · Scope

Site assessment

Walk-through with your site contact; scope of works mapped to task level; SWMS and chemical list matched to the site; induction pack prepared in your format or ours; access, alarms and key protocols documented.

Week −1 · Crew

Allocation & inductions

Crew allocated by WCScoring and proximity — certificates (police check, WWCC where required, insurances) verified and supplied to you. Site induction and toolbox talk one delivered and recorded. Supervisor assigned by name.

Day 1 · Deliver

Supervised first week

Supervisor on site for the first shifts; sign-in/out live from shift one; your contact receives the mobilisation summary — who, when, with what documents — before the first invoice, not after.

Quality, Held

The QA loop that keeps
month six like week one.

Monthly scored inspection against your scope — pilot KPI ≥ 95%, photos attached
Unannounced spot checks between inspections — crews never clean "for the audit"
Every finding gets an owner and a due date; closure verified at the next visit
Repeat findings escalate — toolbox talk, then re-allocation if the score doesn't recover
Performance feeds WCScoring, so allocation quality compounds over time
Everything lands in one monthly pack your contracts team can file as-is
Field Scenarios

What "reliable" looks like
on a bad morning.

Scenario 01 · The 5:40am no-show

Cleaner calls in sick before a 6am start

The roster system flags the gap the moment the shift is declined. The supervisor activates the cluster bench — cleaners ranked by WCScoring within minutes of the site. Replacement on site inside two hours; your contact notified with the replacement's verification summary before the site opens. The event is logged and appears in the monthly pack.

Scenario 02 · The reactive call-out

Spill in a common area, mid-afternoon

Your site contact calls one number. The nearest verified cleaner is dispatched with the site's SWMS and chemical protocol already on file — on site within four hours, usually far less, with sign-off photos on completion. No sub-sub-contracting, no stranger on your client's site.

Scenario 03 · The audit finding

Inspection scores a zone below standard

The finding is photographed, assigned to the crew with a due date, and covered in the next toolbox talk. Closure is verified at a follow-up visit, not assumed — and if the same zone fails twice, the allocation changes. Your monthly pack shows the finding and the fix, because a corrected fault documented well is what audit-proof looks like.

Transparency

What we share — and what
we'll never share.

Please understand what you won't find here: client names, site addresses, photos of current sites, or activity histories. Our partners' client relationships are theirs — the same confidentiality that will protect your brand and your head contract protects theirs today. We don't trade on third-party information, in tenders or on websites.
What we can show — growth, openly
$28.5K $767K $918K ~$1.5M FY23 FY24 FY25 FY26* ATO-lodged ATO-lodged ATO-lodged provisional
Annual revenue, AUD. FY23–FY25 as lodged with the ATO (company tax returns); *FY26 is a provisional management figure ahead of year-end close, with the first half ($468K) backed by quarterly BAS lodgements. Growth funded from retained earnings, not external debt. We publish our own trajectory because it proves operators keep choosing to work with us and clients keep renewing — without exposing anyone else's information. Audited detail, references and the full delivery record are available under NDA. Figures are provided for information and do not constitute a binding representation.
See It Yourself

The rest we prove
on your site.